1999
Tiemersma Motorsports Team #67 - (Newmarket, ON)Driver
Diary
Wed Dec 15th - Body work, Move battery box, Front
suspension changes
Tues Dec 14th - Body work, Front suspension
changes
Mon Dec 6th - Body work, Front clip work
Sun Dec 5th - Body panels, Repairs &
improvements to front clip
Sat Dec 4th - Dyno Engine
Thurs Nov 25th - Body panel repairs - Work on
prepping brake calipers for next year
Wed Nov 24th. - Repair body panels, Took front
suspension , transmission out.
Thoughts on our year:Goals: a podium finish, did
that * Improve on 13th in points, did that a
11th, that is a little disappointing since we
raised our goals/hopes because we were in the
top10 in points most of the year.* Run up front
to attract a major sponsor, ran up front but
still looking for a title sponsor Overall
thought: We race for fun and we acheived that!
Derrick always says " I don't have the
biggest sponsor or budget, but I wouldn't trade
my crew for anything!" For 2000: unless we
get major sponsor, the #67 will run a limited
schedule.
1999 Race Season review
* 8 top 15's
* 5 top 5's
* 11th in Eastern points, 2 better than Derrick's
rookie year in 1998
* 26th in National points (Did not attend Western
National races)
* Best career CASCAR finish 2nd at Cayuga
* Best career CASCAR qualifying 3rd at Fredricton
* 5 fast heat qualifiers
* 2 top 15's on road courses' Mosport &
Molson Indy (1st career roadcourse races)
* 4th at Hamilton Cayuga 250 pit stop competition
After this weekend the crew
starts taking the car apart piece by piece.
Mon Sept 20th - Change rear gear
for Kawartha, Change oil & tune motor
Sun Sept 19th - Day off for
the team.
Sat Sept 18th -
Barrie was a success; the race a 10 lapper was
fun we finished 3rd behind 02 & 98. Every
driver signed alot of autographs, which is good
promotion for CASCAR.
Fri Sept 17 - Clean
truck and trailer, Load up equipment and car
Thurs Sept 16 - Clean car,
Finish paint and letter car for Herbrand tools
nite at Barrie Speedway , Time engine & do
bolt check
Wed Sept 15 Body work finished, Minor maintenance for
Barrie race
Tues Sept 14 - Clean car up
& start body work, Change rear gear set Change oil.
Mon Sept 13 - 9:00pm arrive at shop: unload car & pit
equipment from trailer
Sept 9th
1999
* Set-up car * Clean up truck&
trailer* Leave for Fredricton around 10:00pm
Sept 8th 1999
* Paint and lettering of car *
Double check all changes and repairs
Sept 7th 1999
* Body panels repaired or replaced
* Maintence; ie oil/lubricants changed/bolt check
Sept 6th 1999 -
This is how the week starts after a crash
* Take body off and all bent
parts
Damage: * Left side upper / lower
control arms * All tie rods * Right side upper
control
arm * All 4 shocks * Panhard broke
& straightened rear end * Fix crush panels
* Replace all front end parts
listed above
August 31st - Sun.
nite: * Take out engine,* Dismount all used tires
from rims * Take
out rear gear set * Take
suspension off in front end * Take out battery
& all lead.
Mon nite: * Add
lead & battery to oval set-up * Put on oval
suspension *
Put new rear gear set in * Body
work * Uniforms to cleaners * Change oil
pan & oil pick up over for
oval * Change transmission over.
Aug 26th 1999
Update on the Tiemersma Pontiac:
Car is scaled and already to go.* Complete bolt
check done* Radio's charged* Uniforms
readyThurs;* Wash truck and trailer* Wax car
& pit cart/war wagon* Team meeting for quick
over view of weekend schedule
Aug 25th 1999
Update on the Tiemersma Pontiac: *
Fired engine and tuned it.* Check electric
systems.. ie. fans/blowers/alternator. * Double
checked all seat bolts,and safety harness.* Cut
spare decals for car.
Aug 24th 1999
The car decaling and all body work
is complete.
Tires and rims already to go . Our
Elf fuel has arrived, and we did a
quick bolt check on chassis parts.
Painted spare drive shaft, reinforced
fuel refiller bracket. Engine
tuner Matt/ adjusted and checked
carburator, as well as fuel line
check. He also double checked
radiator, & rad hoses. The
team is really starting to get pumped about
the weekend. Talk to you
tomorrow... Dallas Legge
July 25th 1999 -
Repairs after Cayuga crash.: *
left rear 1/4 panel * rear bumper * rear clip
& all rear tin kit/crush
panels * rear end oil cooler pump
* rear-end housing * 1 spring * 1 tire & rim
* pandhard bar & mount * 2 trailing arms *
drive shaft * transmission * bell housing *
clutch* motor mounts * driver water jug *
flapper over flow valve.
Changes to oval
track car for road courses: * different oil pan
and oil pick up * change lead weight locations to
make car neutral * front suspension is totally
different * Car is ready for decalling! Chassis
& body work is pretty much done.
This site uses the services of Engage
for the serving and/or targeting of ads,
promotions and other marketing messages. To do this,
Engage collects
anonymous data through the use of cookies. To learn more
about Engage,
including your ability to opt out of the Engage system,
go to www.engage.com/privacy/privacy.htm